Knowledgebase: Job handling
Jobs scheduling and backup levels
Posted by Zoran Vasiljevic, Last modified by Zoran Vasiljevic on 16 April 2007 17:56
|
|
When a backup plan with a defined pre and/or post-script is scheduled to run, the plan runs the scripts even when backup-level is set to skip. This behaviour confuses most users but is easily explainable. The reason for such behaviour is job manager knowing nothing about a job it is scheduling. The job manager schedules all kinds of jobs: backup, archive, synchronize, label, inventory, etc pp. Every job is handled equally:
| |
|
Comments (0)